Setting out the foundation
Here is a lesson. A friend called Jane bought a house on 800m2 of land. It had 2 entrances, neither of which were legal, because they came across land not designated as rights-of-way. The owners of those in-roads could have denied her access to her property. She needed to build a new road from a different corner of her block, with a new entrance onto the public road. That would have cost a considerable amount of money. Those mistakes were only 2 of 4 mistakes. She sold the house and land, along with those problems, to a buyer who likewise failed to check the boundaries and entrances for legality. Jane might have put up a large brick garage across the only legal entrance she had, and then have to remove it if the neighbours blocked her illegal entrances.
So that is a lesson for you and me. The first step to building, is check your boundaries.
How to set out a job
We will assume that your job is rectangular, that is, every one of 4 corners is a right angle, 90o (sides are perpendicular to each other):
- Step 1:
Check your boundaries, easements and underground cables:
- Are the survey pegs where the land title says they should be ? Wooden survey pegs rot, and owners then guess where they might have been. Some owners move survey pegs deliberately, particularly when they find they have encroached on another's land with one of their buildings.
- Do the fences line up correctly with the survey pegs ? Those who put up fences can be casual in their alignments.
- Is the entrance to your block legitimate ? If you enter the public road directly then it will be. But if you cross other land, even crown land, even a long-used private road, it might not be.
- Check for easements. Easements are for water pipes, sewerage pipes, stormwater drains, underground cables including optic fibre, and even surface drains for rain runoff. Easements should be marked on your land title. You cannot build on easements. Even if you just plant trees on an easement, any repairs to pipelines and cables will require digging through the roots of those trees.
- Locate any telephone cable and optic fibre cable, which will not be marked on your land title. If these are damaged by digging or by heavy trucks running over them, you have to pay out big money. And they might not be where their owners claim them to be. (On my property the optic fibre was only 300mm below the surface instead of the required 1000mm; and it was 30 metres from where their map marked it.)
- Locate where your electric cables and reticulated water will enter your block. Will that influence where you build ? If they are already installed underground, will concrete trucks etc run over them, and perhaps damage them ?
- Step 2:
Using the survey pegs and boundaries, locate where the construction should go. Sink pegs at the corners.
- Step 3:
Decide which 2 pegs will determine your base line. If you are building at the minimum distance from another structure or from the boundary, then, that side will form your base line. Allow for the overhang of the roof. Check the accuracy of the 2 pegs forming your base line. If these are wrongly placed, everything else will be wrong.
- Step 4:
Run a string line along your base line, that is, where the brickwall is to go. Give working clearance at each end, by running the ends of the line well past the corner pegs (by, say, 2m).
- Step 5:
Run another string line along at 90 degrees to the first for the next wall. Make sure the first two string lines are square to each other. For small jobs of no consequence, this can be achieved with a large square; but for a shed or larger, use the 3-4-5 rule, which says that any triangle with sides in the ratio of 3-4-5, will be a right-angled triangle. For better accuracy use multiples of the 3-4-5, such as 6-8-10 or 12-16-20 and so on; the bigger the meazurements, the more accurate the right angle. Thus, for a small shed, use 300-400-500mm; for a small house use 3-4-5m, and for a football field use 30-40-50m.
- Step 6:
Meazure out the length of this 2nd side, and move the peg which you originally placed for this corner, but which will now be proved to be slightly inaccurate.
- Step 7:
From the other peg of your base line, run another stringline at right-angles, to get a 4th peg. Adjust the peg you originally placed for this corner.
- Step 8:
You now have 4 pegs repositioned, but they still will not form a perfect rectangle. A perfect rectangle has equal diagonals. A diagonal is the line joining 2 corners. So you now have to juggle your pegs to give the best result. If you are more than a few centimetres out, redo your right-angles from the base line to check. (If you are new to the game, then re-doing it will improve your skill.)
- Step 9:
Check your angles, lengths of sides and diagonals. Keep re-doing till you are right.