| Setting out an arch that is going to be face brickwork.
If you are going to be bagging the arch (bagging brickwork) the brickwork should also be laid as face brickwork as it will be seen through the bagging. You need to mark out the gauge on the arch profile/template for the voussoirs (see glossary), prior to laying. | ![]() | |
| Bagging is rendering with a very soft mortar (still using fat sand and detergent or lime). By adding a dye this can be colored permanently without painting, which requires maintenance. Single-story houses with over-hanging rooves, given an earthy brown color, look magnificent. The bagging must be thick to prevent rain darkening the lines of mortar. | ![]() | ![]() |
| If the faces of the bricks are not cut exactly, the bases will not line up, and direct light falling inside the arch, will highlight the mistakes. If the arch is a perfect semi-circle, all the voussoirs will be identical in shape. If the Arch is flatter on top than at the sides, then adjacent voussoirs will be shaped differently. They will need to be numbered with chalk to maintain correct sequence. | ![]() | |
| This diagram looks very rough but this might be due to camera angle or distorted paper. | ![]() | |
| Note the bricks are slightly wedge-shaped after being marked and then cut with an angle grinder - tedious and dusty job. The pattern (shaped chipboard) provides a firm base to keep the bricks in position. The bricks must be perpendicular, that is, at right angles to the tangent of the pattern. As in all brickwork, the mortar must be of equal thickness. | ![]() | |
| The nearest 3 voussoirs are incorrectly cut or incorrectly positioned because their bases are not smoothly lined up. This shows how difficult this job is. I would use spacers to guarantee their settings. I would have drawn in pencil the lines leading to the bricks, so that misalignment is immediately obvious. This saves time. No time is lost by pencilling because this is done when setting up the bricks. | ![]() | |
| In the next 5 photos on the same job, the mortar is tapered instead of the brick - see how ugly the job becomes. The bricks are also laid unevenly. This is OK, being a cheap job to be concealed by rendering, (covered with plaster). It might also pass for walls to be painted, hacienda style.
Lay the bricks in progression up the arch profile. As the stringline goes up for each course, this will keep the voussoirs in line with everything else. | ![]() | |
| Everyone looks AT the job, instead of INTO the job, to see both good and bad workmanship. Budding home owners need to learn. Read the plans to see how deep the foundations go, and how thick they are (although builders often cheat, and councils often fail to check). When clay expands and shrinks, will the foundations crack, sending cracks up through your brickwork, cracks you can lose your hand inside. | ![]() | |
| This brickwork looks unprofessional because the voussoirs have not been tapered. The mortar is wedged to accommodate the arch. Such a cheap unskilled job saves money and is not a problem, provided it is to be rendered or bagged. Ideal for the apprentice to practise on. | ![]() | |
| This next photo shows shoddy brickwork. The badly cut bricks are not in line. These mistakes will glare at you forever. Either paint them, but then why use bricks instead of cement sheeting; or make the pseudo-brickie do it again. | ![]() | |
| The curved chipboard looks as though it is sitting on the brickwork, but the previous photo shows it is sitting on vertical timber studs. Brickwork like this shows why you should inspect the brickie's handiwork on other jobs, before hiring him - soo-oo ugly. | ![]() | |
| Gauged bullseye, parallel perpends, wedged bricks. | Gauged bullseye; (a) 2 keys; (b) 4 keys (a) Marking for lower arch; (b) Profile for upper arch. | |
![]() | Press [Ctrl] while tapping [+/=] 8 to 11 times. This will give a clear image with text. Note: there are 4 keys in the 2nd diagram, giving a different sequence of voussoir. | |
| These diagrams show how to set up a bullseye. They also show how to do arches. The next row delves into flattened arches (approximating the top halves of ellipses). | ![]() | |
| To draw a flattened arch On the chipboard draw a line longer than the width of the arch then mark on it the length of the arch. Press 2 thumbtacks or hammer 2 small nails into the pencil line about 1/4 from each end. Tie string, about 11/4 times the length of the arch, that is, from one end of the marked line to the other end, and back to the nearest nail. Use a pencil to stretch the string taut, then run the pencil, keeping the string taut, from one end of the arch (that is, the pencil line) to the other. This, with care, will give a perfect ellipse. Drawing an Ellipse using 2 nails, string and pencil. Click this link for diagram, click back arrow to return: Link: "Drawing an ellipse." Stand your board upright against the wall and critically decidewhether your like the shape. Adjust the position of the pins to change the shape. Adjust the length of the string to match the length between nails/thumbtacks. When your have the ellipse near perfect, then adjust the shape slightly, without the string, till you decide it is perfect. Caution Some of us have lopsided brains - to us, things which are lopsided might look symmetrical. To counteract this fault, trace your ellipse on thin or transparent paper, then study the reverse side - does your ellipse still look symmetrical ? If so, go ahead. If not, ask someone to correct it. Keep checking. | ||