From Brickie at www,brickworks.net.au, Nov 2010, accessed Dec 2011
 
All masonry expands and contracts. Expansion or control joints allow:
  • masonry to expand without cracking the wall.
  • for any movement in foundations to be taken up without the brickwork cracking.
Expansion joints are put about every 6 Metres. Here a 12mm dia steel rod is used for spacing, removed at the end of the run or day, and the gap cleaned of all mortar. Flexible compressible foam is then inserted to fill the gap and then caulking added. Expansion wall ties are put in every 7 courses (600mm), and where they are specified on the plan, usually every 6 metres. Note the metal brace on the wooden studs.
expansion_1.gif expansion_2.gif expansion_3.gif

Incorrect Expansion Joint


expansion_4.gif expansion_5.gif

The brickwork here is only months old and was laid without a continuous expansion joint that doesn't go the entire height of the wall - it stops beneath the window sill. The window sill was laid with mortar and without the expansion joint it should have had.

The result is that the brickwork on both sides of the expansion joint has settled.
The solid mortar joint has in effect held part of the brickwork up and not allowed it to settle, resulting in cracks running across the brickwork.