Introduction to How House Construction Works
Setting the Stage
Steps to Building a House
Site Preparation
Foundation
Basement
See more »
Thinking about building a green home? Learn about green building options and other ways to make your life easier on the environment at Discovery Planet Green.
Steps to Building a House
The majority of homes are built using completely standardized building practices because of a set of uniform building codes that apply across the country. Another reason is cost -- the techniques used to build homes produce reliable housing quickly at a low cost (relatively speaking). If you ever watch any house being built, you will find that it goes through the following steps:
- A major problem is having the required plans and the official stamp of approval, when the relevant job is required to be doen. All tasks belong in a sequence - miss a job and all other jobs are blocked. You still have to pay your staff while they sit around doing nothing because you did not plan properly - do not blame other people for the delays which you should have foreseen.
Endless engineering plans to be approved by your local council. Payments to engineers and to council. There is no point trying to list details because they vary between countries and between regions within countries. The only way is to pester the local councils, and their staff who NEVER reveal everything you need to know. Their power is proportional to your ignorance. Try to obtain a definitive list of charges by the different authorities so you can plan your cash flow. On the positive side, some planners and engineers within departments, if you plead for advice because of your ignorance, that is, admit your ignorance and their superiority, are often extremely helpful in their advice. They have often rescued me from the pitfalls of ignorance.
- Building applications & permits: with stamped approval (to be stored in a safe place). House plans & approval; Site plan - are your boundaries correct ? Is the soil tested for load carrying ? suitable for house; suitable for waste disposal, suitable for entry & exit by vehicles, distance from front boundary, side boundary, adjacent houses, permanent streams on or near property, slope, soil quality
Town planning applications
- Reticulated water supply
- Waste disposal: Stormwater, Grey Water & Sewage/septic/other; garbage; connection to sewer by officially recognized plumber; to be officially inspected, approved and signed.
- Gas &/or Electricity supply (public energy provider or solar) - to be inspected officially and approved with signed paper signed by an electrician officially approved to do that particular job, before the provider will connect you. Electricians and plumbers come in different grades, different skills - choose the right one.
- Fencing during construction to keep out the public; scaffolding may have charges and require approval.
- Telephone connnection (now obsolete), ADSL, NBN
- Builders' Licensing Boards; you might need a licence to be an owner builder; might need to do a TAFE course (attend night school).
- Insurance for self and offsiders. Ensure that all contractors are carrying their own insurance, by visual inspection of their insurance papers. Otherwise you might end up being bankrupted by the costs of litigation. Check tradesmen registration, insurance, long-service leave portable contribution fund, and anything else. You have to ask because no-one volunteers this information until the pay date catches you unawares. Cash flow is everything.
After the work is done, you MUST obtain Certificates of Compliance where relevant, and store in a safe place. Make photocopies of everything and store in a different fireproof place as a backup.
If all this seems to be an aggravation, you are halfway right; it is much much worse. Accept it; master it; make friends with all the staff - remember their names.
If you can afford it, hire an architect to lead you through all the fine details that you could never know till after you have finished your project. Can you afford to not hire an architect for this advice ?
- Grading and site preparation
- Foundation construction
- Framing
- Installation of windows and doors
- Roofing
- Siding
- Rough electrical
- Rough plumbing
- Rough HVAC
- Insulation
- Drywall
- Underlayment
- Trim
- Painting
- Finish electrical
- Bathroom and kitchen counters and cabinets
- Finish plumbing
- Carpet and flooring
- Finish HVAC
- Hookup to water main, or well drilling
- Hookup to sewer or installation of a septic systems
- Punch list
Many of these steps are performed by independent crews known as subcontractors. For example, the framing is generally done by one subcontractor specializing in framing, while the roofing is done by a completely different subcontractor specializing in roofing. Each subcontractor is an independent business. All of the subcontractors are coordinated by a contractor who oversees the job and is responsible for completing the house on time and on budget.
So you intend to manage the construction of your Owner-Builder (OB) House ?
Pros
Cons
We will walk through these different stages so that you can see what is involved, understand all the steps and learn about the different materials used in the construction process. We will use a typical three-bedroom home as our example.
- Grading and site preparation
- Foundation construction
- Framing
- Installation of windows and doors
- Roofing
- Siding
- Rough electrical
- Rough plumbing
- Rough HVAC
- Insulation
- Drywall
- Underlayment
- Trim
- Painting
- Finish electrical
- Bathroom and kitchen counters and cabinets
- Finish plumbing
- Carpet and flooring
- Finish HVAC
- Hookup to water main, or well drilling
- Hookup to sewer or installation of a septic systems
- Punch list
Consultants
:
- Architect:
- Valuer:
- Town planner:
- Surveyor:
- Structural engineer:
- Electrical engineer:
- Mechanical engineer:
- Hydraulic engineer:
- Geo-technical engineer:
- :
- :
- :
- :