Concrete introduction

This guide is designed around US procedures, with its:
It follows that what is cheap and good quality in the US is not necessarily going to be cheap and good elsewhere.

Therefore this chapter is given, not as a recommendation of building materials, but for those who, having chosen concrete, want to understand the processes involved.

Index

Index:

High quality slab

High quality slabs require:

Compacting the subgrade

All trenches should be compacted after filling: Most rental yards have compacting equipment and it is worth the cost.

Concrete cracks

When installed properly, concrete is one of the most durable and long lasting products you can use around your home. But it is important that concrete contractors follow well-established guidelines with respect to concrete placement. Durable, high strength, and crack resistant concrete does not happen by accident.

Why concrete cracks:

Low water/cement ratio

Water/cement ratio must not be confused with water/dry-concrete-mix ratio. Although many people use the term 'cement' for what is concrete, cement is the gray powder which is added to sand and metal/aggregate, before mixing all together and then adding water.
Ratios are:
cement : sand : metal = 1:2:4 by volume roughly.
water : cement = 9:20 to 1:2 or between 0.45 and 0.5, by weight.
Try for less than 0.5 because even slight excess water rapidly ruins concrete.

Either use 1 kg of water = 1 litre;
and take the kilogram weight of cement in a mix, halve it, and call it litres of water.
or use 1 tonne of water = one cubic metre;
and take the tonne weight of cement, halve it and call it cubic metres of water.

That gives the upper limit of 0.5.
If you shift the decimal to get one-tenth, then subtract it, you get the lower limit of 0.45.

A low water/cement ratio is the major factor for good concrete.
A low water/cement ratio is essential for all the desired properties of concrete.


And yet, the truckie who delivers your concrete will probably have added water to your concrete, without your permission, so it pours down his truck's chute easily. Or sloshes about easily in his truck's drum. Whatever the reason, he does not care about the quality of your concrete. I have yet to see concrete delivered without excess water in it. When you walk over concrete slabs, check the excess cracking which results.

A guide to water/cement ratios is: For complete Building Code information regarding concrete construction, review with your architect, your ready mix supplier, or at your local library.

Curing concrete slabs

Why cure concrete?
Curing serves two main purposes:
Properly curing concrete improves:
How to cure concrete:
All the desirable properties of concrete are improved by proper curing.

Water-cure

After concrete is placed, the concrete increases in strength very quickly for a period of 3-7 days. Concrete which is moist-cured for 7 days is about 50% stronger than uncured concrete.
Water-curing can be done after the slab pour by building dams with soil around the house and flooding the slab. The enclosed area is continually flooded with water. Ideally, the slab could be water cured for 7 days. Some builders on a tight schedule water cure for 3 days as this achieves approximately 80% of the benefit of water-curing for 7 days.
Consider planning your job to pour at the end of the week, build berms, then flood over the weekend. You get the benefit of water-curing without losing too much time in the schedule.

Control joints

Be active in deciding where control joints will be placed.
Control joints are planned for cracks which allow for movements caused by temperature changes and drying shrinkage. In other words, if the concrete does crack-you want to have an active role in deciding where it will crack and that it will crack in a straight line instead of randomly.
Space joints properly. Space joints (in metres) no more than 24/1000 - 36/1000 times the slab thickness (in mm). A 100mm slab should have joints 2.4m - 3.6m apart.
Cut joints deep enough. Cut joints 25% of the depth of the slab. A 100mm thick slab should have joints 25mm deep.

How to cut joints.
Grooving tools cut joints in fresh concrete. Saw cutting cuts joints as soon as the concrete is hard enough that the edges abutting the cut do not chip from the saw blade.
Cutting joints soon enough. In hot weather, concrete might crack if joints are not cut within 6-12 hours after finishing concrete. In this condition, if you do not want to use a grooving tool to cut joints, there are early-entry dry-cut lightweight saws that can be used almost immediately after finishing. These saws cut 25mm to 75mm deep, depending on the model.
Place joints under walls or under carpet areas. Under walls they won't be seen. Under carpet areas the joints won't have a chance to telegraph through vinyl areas.
Avoid re-entrant corners. Planning the joint pattern can sometimes eliminate re-entrant corners.

Note: Inside corners, where cracks would typically occur, have correctly placed joints.
Most plans do not have joint spacing marked on them, so do not leave this important part of concrete construction to chance.
Jointing is often not taken seriously enough and the "sawcutter" comes to your job and puts the cuts where he feels they belong or where it is convenient for him.
Be active in deciding where control joints will be placed!

Three types of foundations

The 3 types of foundations are:

The foundation construction process

Listed here is the foundation construction process: