SafetyRead the instructions before beginning your project.Wear an approved dust mask when cutting, planing or sanding timber. Wear a mask if there is cement dust in the air because cement dust is corrosive, and your lungs are very vulnerable. Keep children off-site. Growing children are especially vulnerable to dust, although they might not show symptoms for several decades. Keep children away from tools and materials. Rope off an area for children, from which they can watch in safety. [Children should be taught to use adult tools, but under patient guidance and close supervision. This can be done after the day's work or on a day off work. Please do not become one of those parents who always shout, "Don't touch that !" Such parents later on complain that their children are irresponsible and useless, but that is always the fault of the parent.] Safety glasses and ear protection should be worn at all times. Failure to wear ear protection in the presence of loud noise, can lead to future tinnitis, a persistent and incurable loud ringing in the ears. Tinnitis can be so loud that it awakens you at night. Many of us have tinnitus now because ear protection was unknown in the 1950s when we began work, and no-one talked of safety-on-the-job. Prepare the siteFirst decide on the height of the finished surface. Keep the concrete surface slightly below the level of the lawn to make it easier for lawn mowing.Excavate the proposed site to allow for the concrete to be 75mm thick Be sure to allow an extra (50mm ?) width for the thickness of the formwork. (See Fig. 1 at the beginning.) If the site is noticeably sloping, you may wish to follow the contour or put in steps to vary the levels. If you plan a curving path, use the garden hose to establish pleasing curves, then follow with formwork. Fixing the formworkStart by driving a peg at each end. Make sure the tops are level with the proposed height of the concrete. Then attach a string line to each. The string position should indicate the side and height of the finished surface.For formwork support, drive 50 x 38mm pegs along this line about 500mm apart and 25mm back from the string (see Fig.2) Take them down until their tops are slightly below the string. Or saw them off level with the formwork. For curving lines, drive the pegs following the line of the garden hose for shaping. As formwork, attach 75x25mm straight battens to the pegs using 50mm nails. At the same time, hold a dolly (heavy hammer or similar) on the backside of the pegs to prevent them loosening. These boards should align with the string line. On curving paths, position two thicknesses of hardboard with pegs spaced apart as necessary. ReinforcingPrevent unsightly cracking by installing lightweight reinforcing mesh.For small jobs such as paths, instead of mesh you could make separation joints in the concrete approximately every 1000mm. The mesh can be embedded into the wet surface of the concrete after pouring just enough to bed it in, ensuring it has about 25mm concrete over it but not more than 30mm. For driveways, you will require mesh and separation joints every 3000mm. Rest the mesh on bar chairs spaced at 800mm apart both ways to cover the mesh with 25mm of concrete. Pour the concrete after the mesh is installed. Pouring the concreteMost pre-mixed concrete companies will calculate your quantities if you provide the measurements.When using dry bagged concrete, follow the mixing instructions on the bag. Soak the excavated area with water prior to pouring, especially if it is a hot day. Pour the concrete, and either walk it in or tamp it with large-section timber (75mm x 75mm), to remove air bubbles. Hit the formwork with hammers to remove the air pockets. Then screed the surface with a straight edge. Smooth the finish as much as possible with the screed before using a float. FinishingSmooth the surface with the wood float, then with a steel trowel. Repeat the trowel work as the cement dries and until the surface is fairly smooth.A non-slip finish is gained by passing a soft nylon house broom across the surface (as in Fig.4). Wash the broom out immediately afterward to prevent damage by setting conrete. Apply an edging tool after each pass of the steel trowel and finally after the brooming. Remove the formwork after three days. To prevent damage to concrete edges when removing, tap the formwork from above to loosen the bond; tap gently downward first to separate, then outward to remove. If your path is next to a garden bed, ceramic edging may be required to keep a raised bed in position. |
Formwork must be too solid to bend under the pressure of compacting concrete. It must be fixed to remain in position during the heavy work of pouring.
Laying steel reo on top of the concrete.
Inserting a board temporarily to act as a joint-line. You can fill to this board, then take a break. Remove the board when you return to work.
A shovel can act as a rodder to remove air-pockets; then the flat of it can be swept to and fro across the surface to give it a finish suitable for an external footpath.
These blokes should bend their knees, and keep their backs straight.
The screeding board has to be straight and strong, and long enough to reach across from one formwork to the other and have another metre to spare.
This concrete is far too wet.
Look at all that water floating on the surface. Do not remove it, nor do you scatter cement upon it to absorb it. Any interference will worsen the situation.
To give a surface which will grip your soles in the rain, try a heavy-duty bristle brush, when the surface has become just firm enough to walk on, but not hard. Give an artistic pattern. Then run an edging trowel around the edges.
|