Formwork

Why formwork ?

Qualities of formwork

Placement

Be sure that formwork is placed so it can be removed. If formwork is placed in awkward positions or tight corners it may be difficult to remove when the concrete has hardened.

Materials

Formwork is normally made from steel or timber.
Timber is easy to make into formwork while steel will allow a greater number of re-uses.
Formwork can be made on site or bought from formwork suppliers. Special forms made from various materials can be purchased for forming waffle slabs, circular columns and other special profiles.

Removal times

Form oil should be applied to the inside of the formwork to stop it sticking to the concrete and make removal easier. Coat before the reinforcement is put in place.
Formwork is usually left in place to help curing.
(See Curing.)
Removal time may vary according to the weather, In cold weather, concrete may take longer to gain strength than in warmer weather, therefore removal times will be longer. In normal conditions of around 200C, 7 days is long enough to leave the forms in place unless the concrete is suspended, which brings in other considerations.