Curing Concrete

Curing is to cover the concrete so it stays moist.
By keeping concrete moist the cement crystals grow bigger, interlocking more firmly with sand grains and crushed rock, thus strengthening the bond between the paste and the aggregates.
Concrete crystals cannot grow large if the concrete is left to dry out, and thus the concrete does not harden properly.

When to cure

Curing is done just after finishing the concrete surface, as soon as it hardens enough not to be damaged.

Precaution: When curing, leave the formwork in place to help reduce water loss.
In hot weather (above 300C), or during high winds and low humidity, concrete can dry out easily. In these conditions take extra care while curing.
(See Weather.)

Why cure ?

Concrete that is cured is:

How to cure

Concrete is cured by applying extra water to the surface of the concrete, or by stopping water loss.
Methods:

How long to cure ?

Concrete keeps getting harder and stronger over time.
Household concrete jobs MUST be cured for at least 3 DAYS.
For better strength and durability, cure concrete for 7 DAYS.
The LONGER concrete is cured, the closer it will be to its best possible strength and durability.
(See Properties and Testing.)