This, with the later chapter on mudbricks, is a very thorough analysis of the author's building exerience. Unfortunately I have accidentally deleted the contributor's name. If you are the contributor please let me know, so I can acknowledge your authorship. I am grateful that you have taken out time to share your knowledge and experience with us. The content reveals that the building products are Australian.
GST: goods and services tax, imposed by Prime Minister John Howard so he could reduce corporate tax (quoted from JH as recorded on TV) - in other words, tax the many to pay the few; tax the poor to pay the rich.
Every builder has his own way of doing a job. Almost always they dont like doing it differently, or using unfamiliar materials, so the most carefully explained instructions are frequently ignored. Write into your contract that he pays for corrections to any deviations. Some builders cannot read plans. Somes became self-employed builders because no-one else would employ them. Some builders take your deposit, start building, then go bankrupt, leaving you without a home and forbidden to finish it yourself. Beware. Visit their previous jobs and discuss with the owners, the builder's reliability and workmanship. You are putting up big money, so research all aspects of your investment.
Architects design houses to enhance their reputations and business. Your needs and future comforts are of low priority. If you dont believe me, check magazines on house designs to see rooms that would be annoying to use. I have been to display homes where doors were left unhung since the toilet or washing machine prevented them opening. (How can anyone make a mistake like that ?) One architect-designed home had a room with 3 levels, looking spectacular, but, since hot air rises, the summer sun and winter fire made the top-level unbearably hot. In winter the bottom level was always cold. Even in a small room with a log-fire, the ceiling is much hotter than the floor. (And avoid open fireplaces with brick chimneys. Wood stoves with exposed flues are the only sensible wood fires to have.)
Owner Builder Myths
Owner-builder myths dispelled:
- Money:
Owner-building probably does not save money if you are building the stock standard brick-veneer special. The way to save money is to design a simple construction, however large, such as a single gable without hips or valleys. Then collect over several years the materials you need. The amount of cheap building materials out there is unbelievable - recycled, left overs from new buildings, alternative materials, end of factory runs, ex-demolition materials, etc. And often surplus materials off building sites go cheaply or for free. This can bring big savings. Follow the advertisements for unused stock, surplus to requirements. The biggest decision an owner-builder makes is the balance between how long the job will take versus how much it will cost. Sales of plumbing parts and building tools.
One milkman picked up every brick he saw by the road. Over the years he collected enough to build the foundations of his house. I always check those big trays when some builder is pulling out walls for renovating a house. A small length of wood costs $10 and more, 100 pieces saves £1000, so it adds up to $'000s over a year. Ask the renovator. Ask the builder on a new site, as the building nears completion, if he wants any surplus material removed from site. Sometimes a carton of beer helps or a small tip
- Study:
Meanwhile attend Technical College to develop your trade skills, such as plumbing, electrics, carpentry, small-tool sharpening and repair, etc. And buy your tools when on "specials" or second-hand, like concrete mixers, steel cutters, planers, etc.
- Time:
The potential to really save is there but it dramatically increases the time it takes - collecting cheap materials and developing building skills, takes years. Then there is the time to do the building yourself, planning, designing, getting building approval, hiring contractors (who rarely turn up on the day allotted), arranging building inspections, days lost because of foul weather, and on and on. Time lost over your divorce proceedings.
Do you really want to give up the best years of your life just to build a house ?
- Stress:
Giving up so much time, giving up all your weekends, ignoring your children, so tired you stop romancing your spouse, all these things bring great stress. You forget what life is really about. You stop enjoying life. Worse still if you have other employment, or are living in a caravan with wife, kids, & dog, because these put pressure on you to drive yourself to finish as quickly as possible - but there are always other factors which delay, such as bad weather, unreliable contractors and failure of materials to arrive as promised. Can your family cope ? If your family cannot cope, can you walk away, leaving the house unfinished ? If not, can you cope with divorce ?
- Contracts:
Dont hire without a contract. In your contract, have written who is responsible for the insurance, and what this insurance covers. Do not be caught with a million-dollar insurance claim against you. View the contractors' qualifications. Do they meet Council requirements;?
- Insurance:
Indenmity, Labor, materials
- Reliability:
Owner-building does give you the opportunity to get what you want, the way you want it. And if you don't get it then most likely it is your own fault - and after a previous home built by Dodgy Brothers Builders I reckon its easier to fix your own mistakes than to get someone else to fix theirs.
- Bank:
Your bank manager will most likely tell you it won't finance owner-builders unless they have suitable trade qualifications (ours did initially). Don't worry. There are plenty of money lenders out there - just tell your bank manager goodbye you are off to take your business to one of them. I suspect ours hadn't hit his lending targets for the month as he instantly apologised and approved our loan. Since this, our bank has actually been quite friendly and helpful. [Note: 'June 2001: We have since had a change of bank manager and we now believe everything that other people say about banks. We hate the new one enough that we will take our business elsewhere.]
Surprise costs
Surprise costs (or the ones that were bigger than expected):
- Approvals, applications, permits, insurance, & inspections:
They are endless.
- Recycled Timber:
OK so it's more environmentally friendly (the koala that lost its home is long gone), and more stable than new, but... :
- Often timber recycled through recycling yards, is more expensive to buy (per metre) than new timber (amazing, isn't it ?).
- You have to buy whatever length is available - you may only want a 2.7 metre post, but can only find 3.9 metre lengths. If you require a dozen or more posts, paying for that extra length can be a significant cost.
- Seasoned hardwood is more expensive to work with as it is heavier, harder, and often full of blade-blunting nails or screws. Sharpening your saw after cutting a nail, takes a long time. Replacing a blade takes a trip into town. Using recycled timber can take hours instead of the few minutes with new kiln-dried timber.
- Some timber sizes attract a premium price. A standard (if there is one) mud brick wall is 250mm thick. Therefore posts that are to sit in the wall should ideally be the same thickness. For this reason, in the rare cases they are available, recycled timber that is 250mm wide is much sought after by mud brick builders and is ridiculously expensive. We actually used 220mm and 300mm posts.
- Driveway:
Driveway repairs after visits from trucks in winter.
- Transport:
Transport costs - when asking prices or getting quotes always ask that you are given a figure for transportation.
- Phone bill:
Your phone bill is astronomical. (Make sure you have shares in your telecommunications carrier). Our last phone bill was 16 pages long !!
- Tyre damage:
Tyre damage from driving over nails/screws on the ground. Building rule: Don't run near the driveway while wearing a nailbag.)
- Tool wear:
Tool wear & tear / damage:
- Always rewind your tape meazure through a cloth hung on your belt, to clean the tape of grit. Otherwise the tape will not last long, and this costs time.
- Bow saw blades wear out quickly when cutting mud bricks (we cut three lots of teeth into a bow saw blade with an angle grinder before the blade wears too thin).
- My drill and angle grinder are now both past their prime (Must say my AEG brand drill has always performed excellently during its long, hard working, and abused life. Would certainly buy an AEG drill again. Not so for the Black and Decker angle grinder. This could be a lesson about getting what you pay for. [Some brands offer differently priced professional and handyman models - always buy the former.]).
- Gloves:
Gloves. Because of the lime in the mud brick mortar, you really need to wear gloves when laying mud bricks or your hands look like they belong to Grandma Clampet. To help tie the bricks together barbed wire was laid between every third or fourth course. Handling barbed wire is the fastest way to make a set of gloves non waterproof.
- Cost of materials:
The biggest hidden cost is quality materials: Every time we buy a building product there seems to be a cheap one and an expensive one. We are planning to live in this house forever so we tended to buy the better quality item regardless of the cost (within reason). You also use extra material and pay tradesmen more to end up with a quality house. If you wanted to save heaps, this is an area you can cut.
- GST:
Caused a pre-implementation building boom that drove prices through the roof. Implementation then added 10% to these prices (labour and most building materials were previously tax free). Ensure that whenever you are quoted a price it needs to be clear if it includes GST or not.
- Tool purchases:
There are some tools that dramatically speed the job up, make it safer, do it better, or make it cheaper. At the speed that an owner builder works its often too expensive to hire tools (eg: scaffolding). Often the only practical solution is to buy (try for secondhand with an aim to re-sell when finished).
More tips
More tips on how we made building easier:
- Good building materials supplier really makes things easier.
There is a sawmill near us that sells basically any piece of building material you could ever want. Sometimes their offcuts can make interesting panelling, frre-of-cost. The business is run in a fairly casual manner (ie:If you go in near close of business they will be having a beer out the back and will tell you not to bother paying as they've already balanced the till. Pay next visit.). Their prices are cheap (Certainly have low real-estate overheads as the mill is 10km from any towns) and they don't seem to discriminate between the prices professional builders pay compared to the rest of us. They seem to know nearly everything about building and as all of the tradesmen in the area use them, if they don't know the answer they will refer you to a customer in the shop who knows.
Tradespeople
Don't be afraid to employ tradespeople when doing it yourself is too difficult or too slow.
A carpenter did a lot of our framing work while I laboured for him. This has a few advantages:
- They generally do the job quicker.
- They have the right tools which can provide a higher quality job.
- You can use the tools while they are doing something else.
- You can ask them questions. You learn tips & tricks from them.
- They can provide you with instruction (give you homework), which you can do while they are not there.
- The carpenter knew how to do many things that I would have stuffed up - which I would have had to repeat and buy replacement materials.
Disadvantages:
- The main disadvantage is obviously cost.
- There is another disadvantage that if you are paying them by the hour, and they need materials, it can economically force you to buy the materials at the closest place that sells it, rather than the cheapest (eg: Our local nursery sells cement and timber, but it's up to twice the price of the sawmill 10km away).
Rates of pay: The cheapest tradesman (per hour basis) for us was the carpenter, yet he had the most tools (that were expensive to purchase, required regular maintenance & sharpening, and suffered the more wear and tear than other tradesmen's tools), he required a high degree of skill, and he could potentially cost me a lot of money if he made a mistake.
Whereas other tradespeople such as plasterers or brickies were significantly more expensive (so we didn't use either!), yet they use very few tools (that are cheaper and last longer) and the worst mistake they are likely to make may cost a new sheet of plaster to rectify (although having said that, I know someone who's brickie forgot to put cement in a few courses of mortar). So why the pay disparity?
Assess the situation. For low-skill jobs, buy the tools and learn the skill instead of employing a tradesperson.
Example: If you have read our diary page you know we had enormous trouble getting a bricklayer - even when paying ludicrous amount per brick. The labour cost was going to be $500 to $600 and the waiting timeframe was weeks (and growing) whereas used cement mixers traded around $300 and a new one for $480. The mixer lightens garden imporvements like footpaths, brick walls and barbeques. Since finishing the building, storage of said mixer has never been a problem as everyone else in the district is always using it. If you rent it out, it will pay for itself.
Use other peoples experience, and experienced people:
- When searching for a draftsman we went to one that someone described to us as 'mud brick sympathetic'. This was an understatement. Our draftsman was always genuinely enthusiastic about us building in mud brick. Best of all he had built a number of mud brick houses - he seemed a bottomless well of earth building knowledge, and he was always willing to over advice and answer our questions. We didn't have any of the 'possible to draw but impossible to build' problems we have heard horror stories about. He was able to design the house so pieces fit together optimally (eg: So trusses & rafter spacing is as wide as a whole number of bricks, the rafter spacing lines up with the post spacing, and the wall is an exact number of bricks high etc.) I reckon my first question to an architect/draftsman would be "how many houses have you built yourself ?".
- Our carpenter had previously worked for another owner builder on a similar type of house.
- It seems that half the people we meet these days have owner built at some stage of their lives (and lived in a shed/caravan whilst doing so). Talk to these people, ask them what they had trouble with and what they did to make things easier. If you are really lucky they may come around and demonstrate their skills on your building (or lend you their tools).
- Planning departments at your Council can be a wonderful source of information based on wide experience, if you approach them in a friendly appreciative manner.
Other Money savers
Other Money savers:
- Be efficient with materials usage. When using tradespeople who are charging by the hour it may work out cheaper for them to use a new piece of timber, but if you are doing it yourself you can spend extra time rummaging through your offcut pile searching for a suitable piece. Therefore when you do something yourself you often end up using less material. You can also spend time adapting other 'waste' materials - we have used our lining board offcuts to make doors, shelves, fill holes, beading, skirting, covering, etc.. When we ordered our timber we order heaps of extra 50mm X 25mm (2 X 1) and have used it for battens, beading, door jamb stops, etc.. Because we were buying in bulk it was cheaper. Buying too little may mean paying for extra material (without the bulk discount) and an extra delivery fee on top. You need to be prepared to spend the time turning the timber into beading, architraves or whatever. At worst case the extra timber will end up as garden stakes (OK real worst case is they will sit in a pile behind the shed and rot).
- The large timbers in our house are held together with a mixture of bolts and threaded rods. I can't remember the exact prices, but a half inch bolt, 14 inches long, is around $6-50. Threaded rod (including nuts and washers) that is long enough to make three bolts is about $12-00. Doesn't sound like much of a saving, but when you required about 60 bolts it works out worth making the extra effort.
- Help others and they'll help you (offer them use of your near new cement mixer). Talk to as many owner builders that you can find. They will tell you about good and bad experiences with various tradespeople, suppliers, materials, and techniques. If they live nearby do a labour swap - there are heaps of jobs that are more than twice as fast when two people do them rather than one. I actually have a theory that one person working continuously with a support person will always have a higher output than two people working individually (although it seems to lead to domestic unrest when I'm the worker and Min's the support person ).
- Living on site: This is more a time saver than a money saver:
- You can get home from work, then start on the house, stop for dinner, then back to the house again.
- There's nearly always someone on site, so security is less of an issue.
- Packing up tools and materials is simpler.
- It's more likely that someone will be on site when a tradesperson comes to quote, or delivery person arrives.
- We aren't paying rent - but we do have extra costs such as a caravan and a toilet, shower, kitchen, wood heater, hotwater service in our shed. Some of this extra costs will be recovered later- the kitchen, hotwater service and woodheater will be moved across to the house, the caravan will be sold, and I'm sure I can find a use for the toilet in the shed.
- If you are thinking of building a post and beam house there is a way to save quite a few thousand dollars. Green hardwood is relatively cheap, but is not ideal for post and beam building as it moves and shrinks too much as it dries/settles. Seasoned hardwood is excellent but very expensive. You should go and buy large sizes of green hardwood for your posts, beams & rafters now. Do this even if you don't know what lengths you need - just buy heaps to cover all your options. Stack this timber carefully somewhere safe (termite free and preferably undercover - but this could be difficult). Later (the longer the better) when you actually get around to building you will have seasoned, stable, hardwood. You could buy twice as much timber as you need and could still be better off. Any extra goes in the Trading Post (an Australian newspaper for buying and selling) and you may make a profit.
Contracts
Check with your council what contracts are demanded to build legally, and what conditions are necessary to make those contracts legally binding in court.
What insurance is necessary, with what conditions. Be careful about bending the rules – you could be badly burnt.
Whenever you order materials from a supplier, or accept a quote, put the key points in writing and send this off with your deposit cheque. The most important key point is a delivery or completion date.
It doesn't matter if the tradesperson says he'll be able to do the work tomorrow, or if the nice guy on the other end of the phone says they will dispatch your order out as soon as the cheque clears, put on a date.
If the tradesperson said it's only two days work and he'll start tomorrow then he shouldn't have a problem with a completion date in one or two weeks time (and if he does you should worry). Suddenly when your tradesperson had a better offer of work and two weeks later you haven't sighted him, you are in a better position to get your deposit back (or as we did with the shed company when or shed delivery was very late, tell them they would be paying all our storage and other additional costs we incurred because the shed wasn't ready on time - our shed experience was a spectacular example of a company run on the cheap by hiring as office staff young girls who knew nothing about building or projects. The company stole many deposits by simply dissolving the company by changing its name, while continuing to operate out of the same address and buildings, with the same phone numbers. The
Fair Trade Commission could do nothing to prevent this scam.