Hidden gains
Hidden gains:
- Time:
As money comes in, so you can do more work. You can use rent-money saved by living in your emerging abode, to build. By living in the shell you can ponder changes in design or the materials.
- Reliability:
The job is done properly. Specifications are followed absolutely without some shonky builder sneaking in shoddy cheap-cuts. Workmanship is guaranteed.
- Changes:
Changes when using a builder, cost heaps. Builders will always argue for what is most convenient or most profitable for them. They might persuade you that some shoddy shortcut is the best way.
- Tools:
Once you have bought all the tools for building, you have them for a lifetime of maintenance, extensions, modifications, and more building.
- Rates:
Rates do not increase until your Council approves completion. Complete the house, live in it, but avoid seeking Council approval.
- Materials:
You have the time to wait for any specially-imported materials or kitchen built-ins.
- Quality:
Occasionally you might stumble across a quality-builder, but you might not be able to afford him.
Load-bearing versus Post-&-Beam
Load-bearing mudbrick versus Post-&-Beam mudbrick construction.
Our house is constructed using a method called post-and-beam in which the roof is supported by a timber frame independently of the mudbrick. The mudbricks fill the gaps between the posts and do not bear any weight other than the mudbricks above them.
Load-bearing construction omits the frame so the weight of the roof is supported entirely by mudbricks.
Why use post-and-beam method:
- We had never laid any sort of bricks before. We thought it would be simpler to lay bricks between posts. We were right that it is simple to lay bricks between posts - but it is easy to lay mudbricks anyway. If I ever build again I will not take this into consideration.
- The roof goes up first. If its raining or if its 40oC we can continue building under the protection of our roof. By putting the roof up first we have somewhere shady and dry for timber and other building materials.
- All those exposed timber posts and beams are an impressive feature.
- In the rare event of seismic activity, properly constructed post-&-beam is far more likely to survive and far less likely to kill you.
- In the event of flooding, post-&-beam will support the roof even if the mudbricks dissolve into the floodwaters.
Why use load-bearing:
- Should be cheaper as timber is more expensive than mud-bricks - especially the large timber sizes needed for post-&-beam.
- You would not need to cut near as many bricks. We have to cut bricks to fit in where each course meets a post. There are 25 places in our house where mudbrick meets post. To fit a brick in each one requires a cut brick at least every second course. [Why not make half-bricks to fit ? Why not put the mudbricks outside the posts :?]
- No trees are cut down for the construction of your house.
- You would not need to oil/paint/seal/treat as much external/internal timber.
- The timber of post-&-beam is always a fire-risk, from both bush-fires and house-fire. House-fires can be started with chip-fat fire, spilt turps when painting, dropped kerosene lamp, faulty electrical socket. (Or do you have a fire extinguisher attached to your wall :?) The solution is to brick the posts in, but that would deprive you of the wonderful aesthetic appeal of all that grand timber.
Internal Walls: Stud-&-Plaster or Mudbrick?
Most of the internal walls in our house are the standard gyprock over 90mm pine stud frame. We did this because we thought it would be quicker, easier and cheaper. We also put sound insulation (polyester bats) into the walls.
The steps in building a stud wall is as follows:
- build a frame:
- with a wooden base plate (like a bearer) on the floor or slab
- a row of 2.4m studs standing on the base plate, usually 450mm apart
- a top plate on top of the studs, holding them in line
- horizontal noggins about 1.2m up from the base plate to stop the studs from bending in the middle
- for insulation, put polyester bats between the studs
- cover the studs with plaster-board (sheets of gyprock)
- tape the plaster-board joins; paint the joins with both base-coat (undercoat) and top-coat
- sand painted join, undercoat and top-coat (2x) the entire wall)
- nail on skirtings & architraves, paint skirtings & architraves.
Is this really "quicker, easier and cheaper" than building a mudbrick wall ?
Advantages of mudbrick internal walls:
- I now think it would be easier - especially if narrower (and therefore lighter) bricks were used. Eg: 200mm wide rather than the 'standard' 250mm mudbrick.
- Much better thermal mass
- Much better sound insulation (we are a bit disappointed in our polyester bats)
Disadvantages of mudbrick internal walls:
- More difficult to install doorways, wardrobes, etc.
- More difficult to run cables and pipes (install during construction - think ahead)
- More difficult to attach things such as tiles, cupboards, shelves
- 200mm walls actually take up a lot of floorspace
Next time I will make more use of internal mudbrick walls. I will however have plaster walls in bathroom and kitchen - where there are heaps of pipes, tiles, cupboards, and cables.
|
Choghazanbil
Great Mosque, Djenn
Poeh museum
Preparing the mud.
Packing mud into forms.
Back-breaking
Adobe mudblocks are much bigger than mudbricks.
Bricks can be made on a bench and carried
to the field; blocks are too heavy.
Renewing Adobe surface.
Sadah
Santa Fe adobe
|