Bricklaying - on the job

Print in these diagrams is much clearer when the pictures meazure 300px across. On a small computer screen this can be done by zooming, that is, by increasing its size, by holding down the 'Ctrl' key or button, and repeatedly clicking the +/= key. Decrease by holding down 'Ctrl' and repeatedy pressing '-/-'.
On a mobile phone, put 2 fingertips on the screen and slide them apart.

Learn the terms

Terms:
  • Course: A single row of laid bricks.
  • Joints: The mortar between bricks, usually 10mm thick.
  • Buttering: Coating the end of a brick with mortar to form a vertical joint.
  • Piers: Columns built at regular intervals to support, say, a house, or at the ends of high or long walls to give added strength.
There is a glossary at Core/Concrete ... (index)/Bricks/Glossary
Fence with piers
pier+fence_7.gif not found

Minimum tools

  1. Brickie's stringline
  2. Level for testing that courses are horizontal, and walls are vertical.
  3. Pegs or pins to insert into soft mortar to hold stringline.
  4. Meazuring tape, metal.
  5. Mallet, with cast iron head for hammering large pegs into the ground, and for cutting bricks. I prefer one with a shaped handle.
  6. Trowel for scooping up mortar to butter bricks, and for running mortar along a course of bricks.
  7. Bolster (steel chisel) for cutting bricks.
  8. Bucket for carrying water. Add a can or tin, shaped to give a narrow spout for pouring accurately the last drops of water on the mortar. Mortar should stick to the trowel when the trowel is turned over.
  9. Wheelbarrow for carrying large loads, or sand or wet concrete or mortar.
  10. Spade. The point enables it to 'dig' into dirt when digging trenches. A shovel has a square end and slides under sand/gravel/FCR before lifting. It holds more than a spade.
  11. Gloves to protect the skin from cement and lime dust, which corrode the hands.
  12. Striker to strike the joints, giving 'square' indentation along the joint. 12mm pipe will give a curved indentation.
Tools
not found

Laying out

Laying out looks easy, but accuracy is essential. We use two rules:
(1) The diagonals of a rectangle are equal.
OR, in other words, if the diagonals of YOUR rectangle are not equal then YOUR rectangle is skewed.
(2) To make a right angle or perpendicular make a triangle with the sides in the ratio: 3:4:5, for example: 300mm:400mm:500mm for a wooden triangle, or, multiplying by '3m', we have 9m:12m:15m for a house - easy, isn't it ? The side with '5' is the hypotenuse:
32 + 42 = 52]
Use a metal tape meazure because a cloth one stretches, particularly when old.
Laying out
not found

Footing

Not to be confused with 'foundation', which is under the footing. I think these dimensions are too small, especially on clay which moves considerably with varying moisture content. The money saved by scrimping on footings will not pay for the later endless cracks in the wall. Sand, as in coastal Perth, can be compacted by vibrating machine, and this allows smaller footings than for clay.
Footing
not found

Joints

The mortar between the bricks: the perpendicular joint which adds 10mm to the length of the brick; and the bed joint raising the next course by 10mm, and upon which you bed the next course of bricks. I find these dimensions unaesthetic. I prefer the dimensions and color of the orange bricks from Bali, or the old Australian convict bricks. Unfortunately, the latter, being kiln-fired at a low temperature have a relatively short life.
The joints
not found

The brick

Every skill is accompanied by specialist language. Failure to know the language advertises the novice. However, the frog is rarely seen these days, this grip for mortar being replaced by a set of holes through the brick into which the mortar 'bites'.
The brick
not found

Brick positions

The names tell the orientation
Brick positions
not found

Stretcher bond

Each brick sits across two half-bricks. This is the simplest and most common method of laying bricks. Make your walls the length of a whole number of:
[brick + 10mm joint] x n
where n is a whole number.
Then every second row begins and ends with a half brick. There is no wastage of cut bricks.
Stretcher bond
not found

Header bond

I have never seen this done. The nearest I have seen to this is 3 courses of stretcher bond then one course of header; repeated again and again. This enables the stretcher bond wall to have double thickness, by each header poking through both sides.
Header bond
not found

Scooping up mortar

Try it. Scooping up the right amount and no more, no less, comes with practice.
Scooping up mortar
not found

Buttering

You can see why the mortar must stick to the trowel and then be scraped onto the brick.
Buttering
not found

Mixing mortar

I like to have an island surrounded by a moat, so that the water soaks into the dry mix more quickly.
Mixing mortar
not found

Cutting bricks

Cutting
not found

Gauge rod

Each mark on the gauge represents the height of one brick plus one joint. Remember that the height of the wall must be exactly as the architect designated of the plans. You must not be 1cm wrong.
Design your walls so the length ends in a whole brick or half a brick, never something in-between. Otherwise you waste the day cutting bricks to even up alternative courses.
Gauge rod
not found

Styles of joints

My preferred joint is the ruled joint, done by dragging a 12mm pipe along the joint at the end of the day (when the mortar has set but is still soft - you could use your finger but it will wear out.)
The struck joint is tedious to do, and does not look nice (in my opinion) and I dislike the recessed joint.The recessed joint is often done to insert a dyed mortar for a marked visual effect which starkly robs the brick of its glory. It is also time consuming and therefore expensive.
The flush joint is ready for bagging. However with a good bricklayer, a nice style of brick, and colored mortar, the flush joint looks good left raw.
Styles of joints
not found

Square

This long-armed square sits on the level floor, and rests against the brick wall to ensure it remains perpendicular as the courses are added. It also lies horizontally inside corners to keep them square. Must be made accurately and tolerate rough handling without being made off-square.
To make the triangle square, that is, with perpendicular sides, measure along the sides the ratio 3:4 and put a small nail in each place. Then stretch the tape across from one nail to the next, to get the '5', for the ratio 3:4:5. Try 750mm:1000mm:1250mm for a large square. The triangle in the corner is to reinforce the corner, to stop the join coming apart.
Perpendicular
not found

Bagging

I have seen a novice bag brick walls with a bag dipped into slushy mortar, dyed an earthy brown, to produce a professional finish. If the bricks were laid by a novice owner-builder, this would be an excellent way to finish the wall.
Bagging
not found

The bond

The bricks are laid in patterns called bonds, such that each perpend (vertical joint) is covered by a brick. Thus no perpend extends more than one brick. There are a number of different bonds but the stretcher bond is the most common, the simplest, and allows for a hollow wall and for brick veneer. Bricks overlap by half their length. Alternate courses finish with half a brick at each end, minimising cutting and wastage.
Bonds 1
not found
A header bond lays bricks head on, and thus the wall is 2 bricks wide. Each width of brick covers a perpend below. Alternate courses finish with two 3/4 laid next to each other at each end.
There are many more bonds than shown here, but these are the ones you are most likely to use. See the section on Bricks & bricklaying (in the index)
Bonds 2
not found

Planning approval

If you are planning a large structure, such as a high front brick wall, check your local council's regulations. Fencing is usually regulated. (At the school I attended, they built a 2m high block wall which blew over because a single-block wall is weak without compression; fortunately the children had a day off – so anticipate legal complications.) Small walls within your property, barbecues and trim, do not usually need a permit.

Since a solid foundation is important and different soils have different load-bearing capacity, the design of a large or long wall may need advice from engineers in your local planning authority, or check the Internet for values and do the calculation yourself.

Some two storey houses are built on 450mm wide, 375mm deep concrete foundation reinforced with trench mesh; high brick retaining walls have special considerations to avoid being pushed over.
For low walls, planter boxes, barbecues and such, a concrete base 150-200mm thick and about 100mm on each side of the bricks, is usually sufficient (Fig 5).

Rough out a design and have it checked by your council's planning department.

Materials

  • Bricks
    A standard brick (in Australia) meazures 230mm long, 110mm across (deep) and 76mm high. With a mortar joint of 10mm, it effective space is 240mm long by 86mm high. Design your wall so that:
    its length = 240mm * whole number of bricks (X) - 10mm
    its height = 86mm * whole number of bricks (Y)
    Total number of bricks = X * Y + wastage
    Wastage includes broken bricks (5% ?)
    If you go back later for more bricks they might be a slightly different shade, and not look well against the other bricks.
  • Mortar
    For small jobs, one 40kg bag of ready-mixed mortar lays 40-50 bricks. For larger jobs it is cheaper to bring in sand and cement, and mix your own. Cement and lime come in 40kg bags, and sand by the 1/4, 1/2 and whole cubic metre.
    Specify bricklayer's 'fatty' sand because other sand tends to crumble and fall off when trowelled onto bricks. Allow 3/4 m3 of sand, 4 bags of cement, 4 bags of lime per 1,000 bricks laid with a stretcher bond.

The job

  • The mortar must be 10mm thick, so as a beginner you will work more quickly if you have a checking device. From a piece of wood about 150mm long, carve a square-section rod. Make the ends of the rod exactly square meazuring 10mm x 10mm. Then shave off a paper-thin sliver so each end fits into a 10mm gap comfortably. Keep this in your pocket while laying bricks to check the thickness of your mortar. As you gain experience you will need it less and less.
  • Set out reference lines for the thickness of both the foundation and walls using stringlines.
  • Build hurdles from suitable scrap timber and erect them at opposite ends of the walls, clear of the working areas. (Fig 4)
  • Meazure the exact locations of the wall corners on the ground, then extend the stringline between these points to the hurdles and mark by hammering in a nail.
  • Tie a line to one of the nails and stretch to the other hurdles.
  • Loop the line around each nail and keep taut. The stringlines will give an accurate line to follow for digging the foundation and laying bricks.
Laying out
5.gif not found

Foundations

  • Dig the foundation trench to the dimensions recommended by your council, down to the depth required.
  • As a guide to laying the concrete level, hammer in pegs at 600mm intervals along the middle of the trench. The peg's length above the ground marks the thickness of the concrete.
  • Place a long straight timber across the first 2 pegs and test with a spirit level. In this way adjust the pegs till their tops are all perfectly level. If the ground is sloping, then step the foundations so that each step is level and the height of each step above the one below, equals a brick + 10mm mortar.
  • Pour in concrete, (metal : sand : cement = 4 : 2 : 1) until flush with the tops of the pegs. Leave to set hard.
6.gif not found

Mortar

Either use ready-mixed mortar or mix cement : lime : sand :: 1 : 1 : 6 on the mixing board for the brickwork. Meazuring by shovelfuls is OK but inaccuracy can give noticeably different coloring. I prefer to use a small bucket filled to the rim, for the unit; filled by a narrow square-ended garden spade. Allow roughly 1 bucket of water for each bucket of cement.

Method:
  • I spread the sand across the board then sprinkle the lime and cement thinly over it.
  • Then, using the garden spade, go to one edge of the pile and scoop up that edge to flip it over, back onto the board, followed by a digging motion to tread the layers into each other, without moving the scoop from its end position.
  • Then scoop the mix immediately next to it and flip it on top of the first scoop, repeating the digging motion.
  • Work along, always flipping each scoop onto the edge of the previous scoop, half-covering it.
  • When the pile has been turned over, repeat the process by placing the first scoop towards the other end of the board. Go through the whole process again, 6 times, backwards and forwards till thoroughly mixed, and there are no streaks.
  • Form a hollow in the mound and pour in half the water.
  • With the garden spade, draw the dry mix into the water, gradually adding water as it is soaked up. Do not let any water escape as this floats off the cement, ruining the mix.
  • Turn the whole mix over several times, sprinkling water where the mix is too dry.
  • Mortar has the right consistency when:
    • it will hold the impression of the trowel point
    • or of your fingers when you squeeze it
    • or when you can scoop it onto your trowel, turn the trowel upside down and it does not fall off.

Lay the bricks

Move the stringline for the outer face of the wall on the hurdles (see above diagram) then lay the bricks out dry for the first course along the foundation to work out their correct placement.
Lift them to one side and set the course accurately to the stringline by laying a bed of mortar.

Method:
  • Using a trowel
    • To lay a bed, chop off a section of mortar with the trowel, about the same size as the trowel.
    • Separate it from the rest of the mortar pile with a clean slicing action and shape it into a curve, as near to a sausage as possible (Fig 7).
    • Sweep the trowel underneath to lift it from the mortar board in one go. Hold the trowel above the place on which you wish to place the brick.
    • Slide the trowel in a quick sudden movement, out from under the mortar, to lay the mortar in a sausage shape in place. Then use the tip of the trowel in a stepping action along the middle to spread it out.
    • Lay enough for at least 2 bricks at a time.
    • Lay the first brick in place and tap it down with the butt of the trowel handle until the top outer corner of the brick rests against the stringline, with the mortar just 10mm thick.
    • Check with your wooden 10mm-thick rod on the side opposite the stringline to make sure the brick is horizontal. If it is slightly out, when the sun passes overhead, each brick will cast a shadow across the face of the brick below, exposing to everyone the skill of the brickie.
  • Buttering
    • For the next brick, butter one end before you lay it, to create the vertical joint.
    • When the first course has been laid, you can dispense with the hurdle line and use bricklayers' pins and line, gauge rod and spirit level instead.
  • Brick-cutting
    • Each brick for all the following course should stradle two on the lower course, so you will probably have to cut bricks to fit at the ends of alternative courses. Mark a cutting line on each face of the brick.
    • Nick the line all around the brick, using your bolster and club hammer.
    • Place the brick bottom on the grass or sand, putting the bolster exactly on the nicked line, to give it a strong sharp blow. The brick should break cleanly along the line (Fig 9).
    • If using a bolster to cut the brick and the cut is "near" a hole in the brick, angle the bolster towards the hole, so the brick will cut much better.
  • Racking
    • The corners can now be racked, that is, built up by several courses. With each new course, check that the corners are rising correctly with the gauge rod.
    • With the spirit level, check that each brick is level and that the brick faces are both horizontal and plumb (vertical).
    • Once the corners are racked up to 4 courses, say, the mortar of the bottom course has set enough to take pins to hold your stringline taut.
    • To lay the 2nd course, tap bricklayer's flat pins into a vertical mortar joint at one end of the wall. Stretch a stringline from these pins to the other end of the wall, then secure the line taut with a 2nd pin, so that it is in line with the top edge of the next course.
    • Lay the bricks in the middle to this line, testing each course for level and plumbness.
    • Move pins and line up each course intil all courses are filled between the racked corners.
    • When the last course is complete, build up the ends again and fill the middle until you reach the planned height.

Finishing

Joints must be finished off before the mortar dries. There are several ways to do this:
  • Flush joint: the simplest, made by drawing the trowel across the face of the bricks to create a mortar join which sets flush to the brick surface.
  • Struck joint: made by drawing the trowel steadily at 20-30o angle along the joint. Do perpends first then horizontal ones using the full length of the trowel in a firm backwards action.
  • Rounded joint: drag the end of a 13mm pipe or rod along the join to scrape a smooth concave finish. A larger-diameter pipe gives a less noticeable curve. (Simple, professional-looking, without appearing artificial.)
  • Raked/recessed joint: rake a steel scraper having a 10mm wide rectangular extension along the joint to achieve a recessed vertical face to the mortar, about 6mm deep. Or hammer a masonry nail into a wooden block to the required depth. (A raked joint gives a black shadow under a glaring sun – strikingly neat but lacks a natural appearance.) Suitable for pointing, that is, later filling with a differently colored mortar.
Do perpends first then horizontal joints, for a better finish.

Cleaning up

Never leave brickwork uncleaned for longer than 2 days after it has been laid:
  • Start at the top and hose off as much mortar as possible.
  • Scrape with a wooden scraper using plenty of water to help.
  • Remaining mortar smears are removed with a mixture of 1 part muriatic acid/hydrochloric acid/ spirits of salts to 10 parts water. (This acid, concentrated when bought, burns skin and clothing – beware ! Wear elbow-length industrial rubber gloves, gumboots, face shield, long trousers, long sleeved shirt.)
  • Working in 1mo sections, fully saturate the brick wall surface with water first.
  • Using a stiff dairy brush dipped continually in the acid solution, vigorously scrub the wall.
  • Stubborn smears and lumps can be removed with a steel scraper.
  • Do not let the mixture dry on the bricks. As each section is cleaned, wash immediately with clean water.
  • If any mixture splashes your skin or clothing, wash immediately with copious clean water.

Step 12: Checklist

Along with tools this is a minimum list. Your particular job might need extras, such as some stone work, or coloring for the mortar.
SupplierPhoneDate
ordered
Date
rec'd
MaterialsQtyPrice/
unit
Total price
  Bricks (material, style, color)
Concrete for foundations
Pre-mixed mortar or: *
Bricklayer's 'fatty' sand #
Cement
Lime **
Liquid plasticiser @
Scrap timber for hurdles
Tools to be purchased
Total cost
Money allocated
* Dry mortar can be bought to avoid the tedium of mixing. Such bagged mortar is easier to move around and keep out of any rain. There is less wastage, and less time spend mixing. Any left over can be kept for another job. But it is more expensive than buying the 3 materials separately.
# Bricklayer's fatty sand, because other sands tend to crumble and fall off when trowelled onto bricks.
** This lime is slaked lime or calcium hydroxide, Ca(OH)2. Always check, because this term, 'lime', is also used for calcium oxide, CaO, which is caustic, and if water is suddenly added, generates dangerous heat which can explode boiling water over you.
@ or detergent; makes the mortar flow more easily so that it sticks to the brick while being buttered, and slides along the top of the course on which this brick will sit.

Tips

  • Any mortar not used within 2 hours of mixing should be discarded. If used it will dry too quickly and not be strong enough.
  • Use a small watering can with a spray nozzle or a small tin when adding water bit by bit to your mortar mixture, to have more control than a bucket.
  • Wherever possible your brick wall should fit brick dimensions and be laid to the nearest half-brick length, width and thickness.
  • If mortar is too stiff, bricks will be difficult to bed; if mortar is too soft, bricks will not stay in place (slide about). Test with mortar on trowel by holding the trowel upside down. If the mortar stays on trowel, the mix is usually right
  • Before buying materials, check with your council about regulations, permits and soil conditions in your area.

Back to Home Handyman Index